Permit Number | FIR16-00133 |
Status | Finaled |
Name |
TREASURE VALLEY FIRE PROTECTION
|
Site Address |
815 E PARK BLVD
|
Project Name | ST. LUKE'S CONFERENCE ROOMS TI |
Customer Number | |
ePlanReview | Yes |
Description |
[St Luke's - Falcon Building First Floor Planning Rooms] - Quick Permit
INSTALL 21 NEW PENDENT HEADS TO THE NEW WALL AND CEILING LAYOUT.
(ST LUKE'S HEALTH SYSTEM OFFICE – FALCON BLDG – 1st Floor Planning Rooms) Remodel for vacant office space within an existing 12,549 square foot floor of a building that is completely occupied by . This building was upgraded under BLD06-01825, it was fire sprinklered for story and area increase. Work to include: demolition of existing non-bearing walls, construction of new interior non-bearing walls to create two “Project Planning” rooms, installation of new mechanical, new electrical, new lighting, installation of new accessible doors / hardware, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
|