INSP-Final Inspection | 3/15/2016 | 3/15/2016 | 3/15/2016 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Miscellaneous action | | | 3/14/2016 | | DONE |
|
|
|
The designer has indicated via email the piping above the ceiling has been verified as sized for OH 2. The drawing which was provided was apparently obsolete.
|
Sprinkler Plan Check | 3/14/2016 | | 3/14/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/14/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/14/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/14/2016 | | 3/14/2016 | | DONE |
Christina Prado
|
|
|
|
1st review completed | | | 3/11/2016 | | PASS |
Tim Frost
|
|
|
|
Intake Approval | | | 3/11/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 3/11/2016 | | 3/11/2016 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 3/11/2016 | | PEND |
|
|
|
This project is on hold pending a letter from Jerry O'Neal indicating the pipe sizing is adequate.
|
Application received | | | 3/2/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 2 2016 1:06PM
|