INSP-Final Inspection | 4/28/2016 | 4/29/2016 | 4/29/2016 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Supply line flush | 4/7/2016 | 4/8/2016 | 4/8/2016 | A | PASS |
Troy Cobbley
|
|
|
Forward flow test of the backflow preventor passed
|
INSP-Sprinkler Rough-in/Hydro | 4/7/2016 | 4/7/2016 | 4/7/2016 | P | PASS |
Troy Cobbley
|
|
|
The new piping has been tied into the existing system. Hydro static test a city pressure passed. Tim is ok with the 8" lateral siesmic bracing connecting to the bottom chord of the girder. Need alarm interconnects and forward flush for final.
|
INSP-Sprinkler Rough-in/Hydro | 4/4/2016 | 4/5/2016 | 4/5/2016 | A | PASS |
Troy Cobbley
|
|
|
Overhead r/i and hydro test for the 8" and 6" mains passed.
|
INSP-Sprinkler Rough-in/Hydro | 4/4/2016 | 4/4/2016 | 4/4/2016 | P | PART |
Troy Cobbley
|
|
|
Overhead for just the main piping passed except I need verification that the lateral siesmis bracing can be attatched to the bottom chord of the truss/girder. Riser nipples not instlled or attached yet. The overhead hydro failed due to a visible loss of pressure at the guage.
|
Intake Approval | | | 3/14/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 3/14/2016 | | 3/14/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/14/2016 | | 3/14/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 3/14/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/14/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/14/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/14/2016 | | 3/14/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 3/3/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 3 2016 7:43AM
|