Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR16-00146
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1099 W FRONT ST
Project NameSimplot Office Building
Customer Number 
ePlanReviewYes
Description
[Simplot World Headquarters - Levels 5]
The fire sprinkler scope of work consists of level 5 - 9 office building. The system will connect to the existing standpipes. New floor control valve will be added. A wet system shall be installed utilizing concealer style pendant sprinkler along with ssu's and intermediate level pendant sprinkler per NFPA 13 for light and ordinary hazards.

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.

SIMPLOT OFFICE Tenant Improvement - This permit is to finish a new 306,345 square foot, nine-story office building for occupancy. The first floor will have a large lobby area, customer experience area and office and training areas. There will be a wellness center at the south end of the main building. Separate tenant improvement permits will be required to finish the future coffee shop, incubator space and future restaurant at the first floor of the annex. The second floor of the main building will be office space. The second floor of the annex will have a large lobby, a multipurpose assembly room and an auditorium. The third floor of the main building will be office space. The fourth floor of the main building will be office space. The fourth floor of the annex is a restaurant with a full kitchen and large exterior patio seating area. The fifth floor of the main building will be office space. The fifth floor of the annex has a kitchen, office areas and a greenhouse. The greenhouse structure is deferred and has not been reviewed or approved. The sixth floor will be office space with an exterior deck at the south end of the floor. The seventh floor will be office space with a large conference room, a kitchen and exterior decks at the east and west ends of the floor. The eighth floor will be office space. The ninth floor will be office space. The core areas were completed under the shell and core permit BLD14-02173. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/7/20173/7/20173/7/2017PPASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Final Inspection10/20/201610/20/201610/20/2016PPART
DetailsJim Page
Final fire sprinkler inspection for levels 5 through 9 complete. FIR permit will stay in issued status (Partial final for records) until BLD permit is ready to be finaled on life fire safety, at time of life fire safety completion FIR permit will be finaled as well.
INSP-Sprinkler Rough-in/Hydro9/27/20169/28/20169/28/2016PPASS
DetailsJim Page
200 psi hydrostatic test for overhead fire sprinkler on levels 8 and 9 complete.
INSP-Sprinkler Rough-in/Hydro9/26/20169/27/20169/27/2016ACANC
DetailsJim Page
Inspection request rescheduled for 28SEPT2016 per conversation with point of contact, Jeff ###-####. This inspection request is cancelled.
INSP-Sprinkler Rough-in/Hydro8/24/20168/26/20168/26/2016ACANC
DetailsJim Page
Hydrostatic test cancelled per conversation with Jeff phone ###-####, hydro will be rescheduled for a later date.
INSP-Sprinkler Rough-in8/24/20168/25/20168/25/2016APASS
DetailsJim Page
Rough to cover inspection for level 9and stairwells overhead fire sprinkler piping compete, overhead fire sprinkler piping located on level 9 and stairwells approved for cover.
INSP-Sprinkler Rough-in8/1/20168/2/20168/2/2016PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping on level 8 complete, overhead fire sprinkler piping on level 8 approved for cover.
INSP-Sprinkler Rough-in/Hydro6/23/20166/24/20166/24/2016APASS
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping complete for level 5.
INSP-Sprinkler Rough-in6/20/20166/21/20166/21/2016APART
DetailsJim Page
West wing section of level 5 rough to cover inspection compete. Overhead fire sprinkler piping on level 5 west side approved for cover. East wing will still nedd a rough to cover inspection performed.
Sprinkler Plan Check4/20/2016 4/20/2016 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  4/20/2016 DONE
DetailsTim Frost
Permit Ready to Issue  4/20/2016 DONE
requirments met
Issue and Print Permit  4/20/2016 DONE
Inspection Record Card- Fire4/20/2016 4/20/2016 DONE
DetailsCarlos Velazquez
Sprinkler Plan Check3/10/2016 3/10/2016 FAIL
DetailsTim Frost
1st review completed  3/10/2016 FAIL
DetailsTim Frost
Miscellaneous action  3/10/2016 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Intake Approval  3/8/2016 PASS
Plan assigned to (Tim)3/8/2016 3/8/2016 DONE
DetailsTim Frost
Application received  3/3/2016 DONE
Application submitted via PDS Online on Mar 3 2016 9:28AM