INSP-Final Inspection | 4/1/2016 | 4/1/2016 | 4/1/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete.
|
INSP-Final Inspection | 3/29/2016 | 4/5/2016 | 4/1/2016 | A | CANC |
Jim Page
|
|
|
Final Phone #: ###-#### >> Inspection requested via web by John Venche Inspection cancelled from web by: John Venche
|
INSP-Sprinkler Rough-in | 3/9/2016 | 3/10/2016 | 3/10/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection complete for the overhead fire sprinkler piping, area of work approved for cover.
|
Intake Approval | | | 3/7/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 3/7/2016 | | 3/7/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/7/2016 | | 3/7/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 3/7/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/7/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/7/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/7/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/7/2016 | | 3/7/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 3/3/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 3 2016 2:11PM
|