INSP-Final Inspection | 6/23/2016 | 6/23/2016 | 6/23/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 3/11/2016 | 3/11/2016 | 3/11/2016 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
|
Permit Ready to Issue | | | 3/10/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/10/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/10/2016 | | 3/10/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 3/8/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 3/8/2016 | | 3/8/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/8/2016 | | 3/8/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 3/8/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2016 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 3/4/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 4 2016 9:09AM
|