INSP-Final Inspection | 8/18/2016 | 8/19/2016 | 8/19/2016 | A | PASS |
Jim Page
|
|
|
Previously noted items have been repaired, 200 psi hydrostatic test for overhead fire sprinklers piping is complete. Final fire sprinkler inspection passed/complete.
|
INSP-Final Inspection | 8/15/2016 | 8/17/2016 | 8/17/2016 | A | FAIL |
Troy Cobbley
|
|
|
Not ready for a final yet. Need hydro test, need siesmic bracing at the top of riser, need coverage in the combustible concealed space, need upright uncovered in the server room, possibly need additional head in the Server room
|
INSP-Sprinkler Rough-in | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations marked "ok" where piping is ok to cover.
|
INSP-Sprinkler Rough-in | 6/6/2016 | 6/7/2016 | 6/7/2016 | A | CANC |
Troy Cobbley
|
|
|
Paul Phone #: ###-####
|
Plan Modification Accepted | | | 6/6/2016 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 6/6/2016 | | 6/6/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/6/2016 | | 6/6/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/6/2016 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/6/2016 | | DONE |
Christina Prado
|
|
|
|
INSP-Sprinkler Rough-in | 6/1/2016 | 6/2/2016 | 6/2/2016 | P | CANC |
Troy Cobbley
|
|
|
Need plan modifications as previously requested
|
INSP-Sprinkler Rough-in | 5/4/2016 | 5/5/2016 | 5/5/2016 | A | FAIL |
Troy Cobbley
|
|
|
No city approved plans or small documents on site. I noted several areas that lack sprinkler coverage. Also additional fittings have been added which could affect the remote area. Plan review needs to provide approval of the revised plans/calculations.
|
Intake Approval | | | 3/22/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 3/22/2016 | | 3/22/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/22/2016 | | 3/22/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 3/22/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/22/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/22/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/22/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/22/2016 | | 3/22/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 3/7/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 7 2016 10:03AM
|