Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR16-00155
StatusIssued
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 777 W MAIN ST
Project NameCity Center Plaza 4th Fl TI
Customer Number 
ePlanReviewYes
Description
[City Center Plaza - Convention Center - 4th Floor]
Connect the existing core fire sprinkler system and install new main lines and branch to supply the entire 4th floor of the City Center Plaza which is part of the Convention Center. The system is designed for OHII.

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.

(THE DISTRICT CONVENTION CENTER FOR GBAD – BOISE CENTRE EAST AT CITY CENTER PLAZA – 1ST, 2ND, AND 4TH STORIES AND 5TH LEVEL) The fire sprinkler system is used for occupancy and to comply with the high-rise requirements of the building code.

4th Story Convention Center: To construct a Convention Center that will occupy the entire 49,767 square foot 4th story. Work is to include interior nonbearing walls, folding partitions, interior doors, suspended acoustical ceilings, suspended gypsum board ceilings, gypsum board soffits, and finishes. An assisted use toilet room is required because more than 6 water closets are required to serve the occupant load of the convention center. Some door modifications to two stairway enclosures are required to deal with the accumulative occupant loads resulting from the main exit. Special Inspection is required for welding.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/14/201611/14/201611/14/2016PPASS
DetailsJim Page
Final Fire inspection complete
INSP-Final Inspection9/1/20169/1/20169/1/2016APART
DetailsJim Page
Final fire sprinkler inspection for level 4 fire sprinkler system located in city center building complete, convention center side of level 4 will be inspected at a later date.
INSP-Sprinkler Rough-in8/23/20168/23/20168/23/2016PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping located on level 4 complete, overhead fire sprinkler piping located on level 4 of the clearwater building approved for cover.
INSP-Sprinkler Rough-in7/27/20167/28/20167/28/2016PPART
DetailsJim Page
Rough to cover inspection complete for 4th floor south bathrooms, south 4th floor bathrooms approved for cover.
INSP-Sprinkler Rough-in7/21/20167/22/20167/22/2016APASS
DetailsJim Page
Rough to cover inspection for hardlids located in the restrooms, 4th floor northside complete, hardlids approved for cover.
INSP-Conference5/9/20165/10/20165/10/2016PCANC
DetailsJim Page
Conference request will be rescheduled due to a doctors appointment per conversation with Richard, conference will be rescheduled for a later date.
INSP-Sprinkler Rough-in3/24/20163/25/20163/25/2016APASS
DetailsJim Page
Rough in inspection complete, a follow up RTC inspection will need to be scheduled after finish ceilings are complete for cover approval.
Sprinkler Plan Check3/15/2016 3/15/2016 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  3/15/2016 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  3/15/2016 DONE
DetailsTim Frost
Permit Ready to Issue  3/15/2016 DONE
Issue and Print Permit  3/15/2016 DONE
Inspection Record Card- Fire3/15/2016 3/15/2016 DONE
DetailsChristina Prado
Intake Approval  3/14/2016 PASS
Plan assigned to (Tim)3/14/2016 3/14/2016 DONE
DetailsTim Frost