INSP-Final Inspection | 5/17/2016 | 5/18/2016 | 5/18/2016 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed/complete
|
Telephone call | | | 4/27/2016 | | DONE |
|
|
|
Rob called to say that he would be adding 2 additional notification devices to meet the minor deficiencies noted on the plan review. As built drawing and calcs that show the changes are required ath the completion of the project.
|
Plan assigned to (Lee) | 3/11/2016 | | 3/11/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 3/11/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 3/11/2016 | | 3/11/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/11/2016 | | DONE |
|
|
|
Plans approved with review comments and requirements.
|
Permit Ready to Issue | | | 3/11/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/11/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/11/2016 | | 3/11/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 3/10/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 10 2016 12:06PM
|