INSP-Final Inspection | 5/12/2016 | 5/12/2016 | 5/12/2016 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Letter from HVAC contractor attached to file
|
INSP-Final Inspection | 4/25/2016 | 4/25/2016 | 4/25/2016 | P | FAIL |
Troy Cobbley
|
|
|
Will be able to final when I get verification that the SIN for the large orfice pendants was a type O and the pendants in the hardlids are changed to Intermediate Temp or verification that the supply diffuser puts out less than 100 degree heat as per NFPA 13 8.3.2.5 (9)
|
Intake Approval | | | 3/24/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 3/24/2016 | | 3/24/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/24/2016 | | 3/24/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 3/24/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/24/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/24/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/24/2016 | | 3/24/2016 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 3/17/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 17 2016 11:42AM
|