Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR16-00222
StatusFinaled
Name ALARM TECH
Site Address 611 S 8TH ST
Project NameThe Afton - Phase 1
Customer Number 
ePlanReviewYes
Description
Provide and install manual and automatic fire detection for 6 story Condominium/Retail building with 2 stories of parking structure. Addressable smoke detection with sounder bases will be used in the R-2 living units. All resident smoke/sounders will actuate on fire sprinkler water flow and the individual residential smoke detectors/sounders will actuate local alarm for individual unit smoke detection with activation of the supervisory signal on the annunciator in main lobby. The fire alarm system will monitor the fire water sprinkler system, control and monitor the (1) elevator and release the electronic access control doors system upon general fire alarm.BLD15-03329.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/7/20179/7/20179/7/2017PPASS
DetailsJim Page
Final fire alarm inspection completed on 17AUG2017
INSP-Sprinkler Rough-in/Hydro8/16/20178/17/20178/17/2017APASS
DetailsJim Page
Final fire alarm inspection for phase 1 passed/complete. Modifications to room 106 for ADA compliance and the addition of smoke detector in room 301 will be included on the as-builts for fire alarms.
INSP-Final Inspection8/16/20178/16/20178/16/2017PCANC
DetailsJim Page
Rescheduled for 17AUG2017, this request is cancelled.
INSP-Final Inspection8/11/20178/11/20178/11/2017PPART
DetailsJim Page
Final inspection for townhomes fire alarms and door release for floors 3, 4, 5 and 6 complete. Townhome number 106 is an ADA room, need audio and visual notification installed and inspected before room can be occupied.
INSP-Final Inspection6/16/20176/16/20176/16/2017APART
DetailsJim Page
Partial final fire alarm inspection complete for TCO requested area's, townhomes and door releases (magnetic door holders on west side doors for levels 3, 4, 5 and 6 not installed at time of inspection, these doors are not to be held open unless done by door release magnet) are the remaining items needing to be tested/inspected for fire alarms, these items will be scheduled for a later date,
INSP-Alarm Testing6/16/20176/16/20176/16/2017ADONE
DetailsJim Page
Alarm testing c omplete for TCO requested area's
INSP-Alarm Testing6/15/20176/15/20176/15/2017PPART
DetailsJim Page
Alarm testing performed on all fire sprinkler devices (all tamper switches excluding south standpipe control valve, this valve still needs to be wired to panel, will be locked in the open position until wiring is complete, fire pump power loss, all flow switches, high low air sensors and dry system pressure switches) Smoke/CO2 detectors were tested in units 601 and 602, devices were not going into alarm, alarm testing stopped until troubleshooting can be performed and issues corrected.
Plan resubmittals received  3/31/2016 DONE
Alarm Plan Check3/31/2016 3/31/2016 PASS
DetailsLee G Meredith
PLANS TAKEN FRONT DESK ALARM  3/31/2016 DONE
Plans approved with review comments.
Permit Ready to Issue  3/31/2016 DONE
Issue and Print Permit  3/31/2016 DONE
Inspection Record Card- Fire3/31/2016 3/31/2016 DONE
DetailsCandy A. Nichols
Telephone call  3/30/2016  
Called Rand to inform him drawings were being returned due to numerous typo's and missing product data. Emailed review comments.
Plan assigned to (Lee)3/28/2016 3/28/2016 DONE
DetailsLee G Meredith
1st review completed  3/28/2016 FAIL
See first fire alarm review comments.
Application received  3/25/2016 DONE
Application submitted via PDS Online on Mar 25 2016 1:03PM