INSP-Final Inspection | 12/20/2016 | 12/20/2016 | 12/20/2016 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 11/10/2016 | 11/10/2016 | 11/10/2016 | P | CANC |
Troy Cobbley
|
|
|
Please call Troy Nelson with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 7/20/2016 | 7/20/2016 | 7/20/2016 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for location dated for today where piping can be covered. I noted wood above the ceiling but the wall contractor provided verification that the wood is fire treated.
|
INSP-Sprinkler Rough-in | 6/29/2016 | 6/29/2016 | 6/29/2016 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for heads marked "ok" where tile is ok to install
|
INSP-Sprinkler Rough-in | 5/26/2016 | 5/27/2016 | 5/27/2016 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler work is complete in the COnference Room.
|
INSP-Sprinkler Rough-in | 5/25/2016 | 5/25/2016 | 5/25/2016 | P | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with point of contact, Troy Phone #: ###-####, inspection request will be rescheduled for later date.
|
Intake Approval | | | 4/11/2016 | | PASS |
|
|
|
|
Plan assigned to (Troy) | 4/11/2016 | | 4/11/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/11/2016 | | 4/11/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 4/11/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/11/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/11/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/11/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/11/2016 | | 4/11/2016 | | DONE |
Brittany Hill
|
|
|
|
CHANGE STATUS TO (REV) | | | 4/11/2016 | | DONE |
|
|
|
DO NOT REISSUE Fees are still due
|
CHANGE STATUS TO (ISS) | | | 4/11/2016 | | DONE |
|
|
|
|
Application received | | | 4/1/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 1 2016 10:57AM
|