INSP-Final Inspection | 2/9/2017 | 2/10/2017 | 2/10/2017 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 2/9/2017 | 2/10/2017 | 2/9/2017 | P | CANC |
Troy Cobbley
|
|
|
Late afternoon - Casey Phone #: ###-#### Inspection cancelled from web by: John Siewert
|
INSP-Final Inspection | 12/22/2016 | 12/27/2016 | 12/27/2016 | A | FAIL |
Troy Cobbley
|
|
|
Need the knox box, need weather proof devices in the shower areas and Crane Alarm needs to be present to test the AES system that they have an open permit for.
|
Miscellaneous action | | | 12/16/2016 | | DONE |
|
|
|
As build drawings and documents received and archeived.
|
Miscellaneous action | | | 12/15/2016 | | DONE |
|
|
|
Earl emailed to note the owner removed a wall and additional notification is now required. He wanted to know if a resubmittal will be required. I reviewed the area in question and the calculations and found the system can handle the accepted load. I responded to indicate as built drawings and updated calculations will be adequate.
|
INSP-Final Inspection | 12/9/2016 | 12/9/2016 | 12/9/2016 | P | FAIL |
Jim Page
|
|
|
No document cabinet by fire panel, wall between storage rooms 2 and 3 has been removed, verified removal on city approved structural drawings, room is designated as "Social Room", social room needs an audio/visual device added per code requirement, device addition will require a resubmittal. Audio/visual devices did not latch into alarm during waterflow, when flow was stopped audio/visuals silenced without command. A knox box will be required due to the building having a monitored fire alarm system. Mens restroom has what appears to be a shower that is not complete, audio visual device needs to be changed to a weather proof type device.
|
Permit Ready to Issue | | | 4/28/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/28/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/28/2016 | | 4/28/2016 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Lee) | 4/18/2016 | | 4/18/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 4/18/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 4/18/2016 | | 4/18/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/18/2016 | | DONE |
|
|
|
Plans approved with review comments and requirements.
|
Application received | | | 4/11/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 11 2016 1:59PM
|