INSP-Final Inspection | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 8/2/2016 | 8/3/2016 | 8/3/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection complete, notated area with red ink that is approved for cover on the city approved drawings, also notated city approved drawings with red ink where hydrostatic test is complete.
|
Intake Approval | | | 4/13/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 4/13/2016 | | 4/13/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/13/2016 | | 4/13/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 4/13/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/13/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/13/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/13/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/13/2016 | | 4/13/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 4/12/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 12 2016 2:24PM
|