INSP-Final Inspection | 6/8/2016 | 6/10/2016 | 6/10/2016 | A | PASS |
Jim Page
|
|
|
Final inspection for basement wet system and loading dock dry system complete.
|
INSP-Sprinkler Rough-in/Hydro | 5/25/2016 | 5/25/2016 | 5/25/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in basement level complete, basement level approved for cover. 200 psi hydrostatic test complete for basement level.
|
INSP-Sprinkler Rough-in/Hydro | 5/17/2016 | 5/17/2016 | 5/17/2016 | A | PART |
Jim Page
|
|
|
24 hour air test for dry sustem located in the basement level garage area passed/complete.
|
INSP-Sprinkler Rough-in/Hydro | 5/12/2016 | 5/12/2016 | 5/12/2016 | P | PART |
Jim Page
|
|
|
24 hour air test on dry system located in lower level garage started at 1:00pm @ 43 psi.
|
Sprinkler Plan Check | 5/5/2016 | | 5/5/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/5/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/5/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/5/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/5/2016 | | 5/5/2016 | | DONE |
Candy A. Nichols
|
|
|
|
Sprinkler Plan Check | 4/26/2016 | | 4/26/2016 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 4/26/2016 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 4/26/2016 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 4/19/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 4/19/2016 | | 4/19/2016 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 4/13/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 13 2016 9:44AM
|