INSP-Final Inspection | 7/25/2016 | 7/26/2016 | 7/26/2016 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed/complete
|
Miscellaneous action | | | 6/7/2016 | | DONE |
|
|
|
Dante requested the project be opened in eplan review so he can upload a plan modification.
|
CHANGE STATUS TO (REV) | | | 6/7/2016 | | DONE |
|
|
|
Changed to review for a plan modification submittal.
|
Plan Modification Accepted | | | 6/7/2016 | | DONE |
|
|
|
|
Alarm Plan Check | 6/7/2016 | | 6/7/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 6/7/2016 | | DONE |
|
|
|
Plan modification approved. No additional review comments.
|
Permit Ready to Issue | | | 6/7/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/7/2016 | | DONE |
Christina Prado
|
|
|
|
INSP-Alarm Testing | 5/26/2016 | 5/26/2016 | 5/26/2016 | A | PASS |
Troy Cobbley
|
|
|
See the city approved drawings for devices marked "ok" that have been tested.
|
Permit Ready to Issue | | | 5/24/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/24/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/24/2016 | | 5/24/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 4/21/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 21 2016 8:13AM
|
Plan assigned to (Lee) | 4/21/2016 | | 4/21/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 4/21/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 4/21/2016 | | 4/21/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/21/2016 | | DONE |
|
|
|
Plans approved with review comments.
|