Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR16-00282
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 6017 W OPOHONGA ST
Project NamePalisades Apartments Bldg #1
Customer Number 
ePlanReviewYes
Description
[Palisades Apartments Building B]
The fire sprinkler scope of work consists of NFPA 13R in a three level building. The systems utilize CPVC piping and residential sprinklers The piping crosses to the other side of the building in a heated chase located in the attic.

The underground piping was reviewed under permit FIR16-00104

Palisades Apartments - Building B - To construct a new 23,000 square foot, three story, wood framed, 24-unit multi-family apartment building and related site improvements. This building will have an NFPA 13R sprinkler system. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/30/20169/30/20169/30/2016PPASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection8/1/20168/2/20168/2/2016APART
DetailsTroy Cobbley
Sprinkler work is complete in apartments 101,102, 201,202, 301, 302. (North end).
INSP-Final Inspection7/1/20167/5/20167/5/2016AFAIL
DetailsTroy Cobbley
This inspection is not for a final. But for approval for the tenting on the south half of the third floor. Piping can be covered.
Fees Due Hold6/15/2016 7/1/2016 DONE
DetailsCarlos Velazquez
INSP-Sprinkler Rough-in6/14/20166/15/20166/15/2016APASS
DetailsTroy Cobbley
The tenting passed for the north half of the third floor. Piping for the north half of the third floor is ok to cover. Included piping crossing the breeze way.
INSP-Sprinkler Rough-in6/13/20166/14/20166/14/2016AFAIL
DetailsTroy Cobbley
Third floor tenting inspection failed again. I left a message on Pats voice mail describing what I saw and locations. Re-inspection fee applied.
INSP-Sprinkler Rough-in6/14/20166/14/20166/14/2016APASS
DetailsTroy Cobbley
2nd and 3rd floor hydro tests passed
INSP-Sprinkler Rough-in/Hydro6/2/20166/3/20166/3/2016PPART
DetailsTroy Cobbley
1st floor hydro test passed. 2nd and 3rd failed due to visible loss of pressure at the guage.
INSP-Sprinkler Rough-in6/2/20166/3/20166/3/2016APASS
DetailsTroy Cobbley
Second floor piping is now ok to cover. Third floor piping can not be covered since the tenting inspection failed again. Riser room can not be covered until tenting is addressed
INSP-Sprinkler Rough-in6/1/20166/1/20166/1/2016PPART
DetailsTroy Cobbley
1st floor north half piping is ok to cover. Tenting inspection failed. North half of the second floor can not be covered until the additional 90s and relocated heads in the remote area have been addressed with plan review. None of the third floor can be covered until the tenting inspection has passed. The insulation used for the tenting needs to be a minimum 38R.
Miscellaneous action  6/1/2016 DONE
Talked with Troy in regards to changes made on the second floor. The changes in this case does not affect the hydraulics or protection.

I followed up with Cam and made sure he knew it was causing project delays and problems when the fitters are making arbitrary field changes without approval first.
Plan Modification Accepted  5/31/2016 DONE
Sprinkler Plan Check5/31/2016 5/31/2016 DONE
DetailsTim Frost
(F) Reprint permit  5/31/2016 DONE
INSP-Supply line flush5/26/20165/26/20165/26/2016PCANC
DetailsTroy Cobbley
Wrong permit number called in for underground flush
INSP-Sprinkler Rough-in5/19/20165/20/20165/20/2016PPASS
DetailsTroy Cobbley
The North half for the first and second floors rough-in passed and the piping can be covered. I also inspected the north half fo the third floor but it did not pass because no tenting had been performed and there are pipe routing changes and additional fittings and added heads that will need to be reviewed prior to a cover inspection being approved.
Sprinkler Plan Check5/5/2016 5/5/2016 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  5/5/2016 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  5/5/2016 DONE
DetailsTim Frost
Permit Ready to Issue  5/5/2016 DONE
all requirments met
Issue and Print Permit  5/5/2016 DONE
Inspection Record Card- Fire5/5/2016 5/5/2016 DONE
DetailsCarlos Velazquez
Intake Approval  5/4/2016 PASS
Plan assigned to (Tim)5/4/2016 5/4/2016 DONE
DetailsTim Frost
Application received  4/24/2016 DONE
Application submitted via PDS Online on Apr 24 2016 10:28AM