INSP-Final Inspection | 1/16/2018 | 1/17/2018 | 1/17/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkle rinspection for area of work complete.
|
CHANGE STATUS TO (ISS) | | | 1/16/2018 | | DONE |
|
|
|
Plan Mod
|
(F) Reprint permit | | | 1/16/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 1/12/2018 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/12/2018 | | 1/12/2018 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 1/12/2018 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Plan Modification Accepted | | | 12/11/2017 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 12/11/2017 | | 12/11/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/11/2017 | | 12/11/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/11/2017 | | DONE |
|
|
|
do not re issue
|
Plan Modification Accepted | | | 12/5/2017 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/5/2017 | | 12/5/2017 | | FAIL |
Tim Frost
|
|
|
|
INSP-Final Inspection | 10/9/2017 | 10/9/2017 | 10/9/2017 | A | PART |
Jim Page
|
|
|
Final fire sprinkler inspection complete, permit will remain in issued status until completion of the project.
|
INSP-Sprinkler Rough-in/Hydro | 9/28/2017 | 9/29/2017 | 9/29/2017 | P | PASS |
Jim Page
|
|
|
24 hour air test for both dry systems complete. Trip test for both dry systems complete.
|
INSP-Sprinkler Rough-in/Hydro | 9/27/2017 | 9/28/2017 | 9/28/2017 | P | PART |
Jim Page
|
|
|
Hydrostatic test for level 1 dry system complete. 24 hour air test start at 3:00PM @ 41PSI
|
INSP-Sprinkler Rough-in/Hydro | 9/27/2017 | 9/28/2017 | 9/28/2017 | A | PART |
Jim Page
|
|
|
24 hour air test for level 2 dry system started at 7:15AM @ 40PSI
|
INSP-Sprinkler Rough-in/Hydro | 9/26/2017 | 9/27/2017 | 9/27/2017 | P | PART |
Jim Page
|
|
|
Hydrostatic test for level 2 dry system complete.
|
INSP-Sprinkler Rough-in/Hydro | 9/22/2017 | 9/25/2017 | 9/25/2017 | P | CANC |
Jim Page
|
|
|
Hydrostatic test for dry system will be rescheduled for a later date, test could not be completed before the end of business day.
|
INSP-Sprinkler Rough-in | 8/1/2017 | 8/1/2017 | 8/1/2017 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in above garage drive thru area complete (area just north of elevator lobby) approved for cover.
|
INSP-Sprinkler Rough-in | 7/14/2017 | 7/17/2017 | 7/14/2017 | A | CANC |
Jim Page
|
|
|
Contact will be Leroy Anderson please contact him 30 min prior to Inspection start... RTC - On 1st floor Prkg Garage drive thru area.
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
Plan Modification Accepted | | | 2/14/2017 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 2/14/2017 | | 2/14/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/14/2017 | | 2/14/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/14/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/14/2017 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/11/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/11/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/11/2016 | | 8/11/2016 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 8/10/2016 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/10/2016 | | 8/10/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/10/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/19/2016 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/19/2016 | | 7/19/2016 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/19/2016 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Plan resubmittals received | | | 6/16/2016 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/16/2016 | | 6/16/2016 | | FAIL |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 6/14/2016 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/14/2016 | | 6/14/2016 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 6/14/2016 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Plan resubmittals received | | | 6/7/2016 | | DONE |
|
|
|
|
Alarm Plan Check | 6/7/2016 | | 6/7/2016 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 6/7/2016 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 5/9/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 5/9/2016 | | 5/9/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/9/2016 | | 5/9/2016 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 5/9/2016 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/9/2016 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 4/25/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 25 2016 1:06PM
|