INSP-Final Inspection | 9/15/2016 | 9/15/2016 | 9/15/2016 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed/complete
|
INSP-Final Inspection | 9/12/2016 | 9/12/2016 | 9/12/2016 | P | PART |
Jim Page
|
|
|
Final fire alarm inspection complete, final items to be tested is the new dry system and associated components.
|
Plan Modification Accepted | | | 8/12/2016 | | DONE |
|
|
|
New notification layout in warehouse areas.
|
CHANGE STATUS TO (REV) | | | 8/12/2016 | | DONE |
|
|
|
|
1st review completed | | | 8/12/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 8/12/2016 | | 8/12/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/12/2016 | | DONE |
|
|
|
Plan modification approved. No additional review comments.
|
CHANGE STATUS TO (ISS) | | | 8/12/2016 | | DONE |
|
|
|
|
Telephone call | | | 8/11/2016 | | DONE |
|
|
|
Rick called to say they will be adding new notification in the warehouse to meet racking layout changes. Requested the work flow be opened to he can upload plan modificaiton drawings & calculations.
|
Permit Ready to Issue | | | 4/29/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/29/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/29/2016 | | 4/29/2016 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Lee) | 4/28/2016 | | 4/28/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 4/28/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 4/28/2016 | | 4/28/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/28/2016 | | DONE |
|
|
|
Plans approved with review comments.
|
Application received | | | 4/26/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 26 2016 10:25AM
|