Information based on query as of Saturday, June 22, 2024.
Permit Information
Permit NumberFIR16-00296
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 300 E MALLARD DR Unit: 350
Project NameSPF Water addition/remodel T.I
Customer Number 
ePlanReviewYes
Description
[SPF Water Engineering TI]
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

(SPF WATER) Permit for tenant improvements to an existing tenant space to expand the original office space with work to include the removal and construction of interior nonbearing partition walls and the installation of related interior finishes per the approved plans. This building is fully fire sprinklered for one-hour substitution with a fire alarm system. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 and 72 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/16/20166/16/20166/16/2016PPASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Sprinkler Rough-in5/18/20165/18/20165/18/2016PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping complete, overhead fire sprinkler piping approved for cover.
Sprinkler Plan Check5/6/2016 5/6/2016 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  5/6/2016 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  5/6/2016 DONE
DetailsTim Frost
Permit Ready to Issue  5/6/2016 DONE
all requirments met
Issue and Print Permit  5/6/2016 DONE
Inspection Record Card- Fire5/6/2016 5/6/2016 DONE
DetailsCarlos Velazquez
Intake Approval  5/5/2016 PASS
Plan assigned to (Tim)5/5/2016 5/5/2016 DONE
DetailsTim Frost
Application received  4/28/2016 DONE
Application submitted via PDS Online on Apr 28 2016 1:06PM