INSP-Final Inspection | 6/10/2016 | 6/10/2016 | 6/10/2016 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Overhead hydro test passed
|
INSP-Final Inspection | 6/8/2016 | 6/9/2016 | 6/9/2016 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled for tomorrow morning for a hydro.
|
INSP-Sprinkler Rough-in/Hydro | 6/8/2016 | 6/9/2016 | 6/9/2016 | A | PART |
Troy Cobbley
|
|
|
General rough-in passed. Earth quake bracing has not been installed yet. Need more supply pipe installed prior to hydro test. Need as-builts showing the four additional heads installed on kick backs on the west end of the system. The combustible concealed spaces/double walls will need to be addressed prior to a cover inspection.
|
Permit Ready to Issue | | | 5/31/2016 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 5/31/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/31/2016 | | 5/31/2016 | | DONE |
Carlos Velazquez
|
|
|
|
Sprinkler Plan Check | 5/27/2016 | | 5/27/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/2016 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 5/23/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 5/23/2016 | | 5/23/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/23/2016 | | 5/23/2016 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 5/23/2016 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/23/2016 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 5/11/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 11 2016 8:51AM
|