INSP-Final Inspection | 8/22/2016 | 8/22/2016 | 8/22/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 8/5/2016 | 8/8/2016 | 8/8/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler located above ceiling grid area's complete, overhead fire sprinkler piping located above ceiling grid area's approved for cover.
|
INSP-Sprinkler Rough-in | 8/4/2016 | 8/5/2016 | 8/5/2016 | A | CANC |
Jim Page
|
|
|
Inspection request rescheduled due to access issues, inspection will be completed on 08AUG2016
|
INSP-Sprinkler Rough-in | 7/19/2016 | 7/20/2016 | 7/20/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler located in the basement for this scope of work complete, overhead fire sprinkler piping located in basement level approved for cover.
|
INSP-Sprinkler Rough-in | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection complete fore overhead fire sprinkler piping above hardlids, overhead fire sprinkler above hardlids approved for cover.
|
Intake Approval | | | 5/25/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 5/25/2016 | | 5/25/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/25/2016 | | 5/25/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/25/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/25/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/25/2016 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 5/25/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/25/2016 | | 5/25/2016 | | DONE |
Carlos Velazquez
|
|
|
|
Application received | | | 5/12/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 12 2016 5:15AM
|