INSP-Final Inspection | 1/18/2018 | 1/19/2018 | 1/19/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
|
INSP-Sprinkler Rough-in | 11/16/2016 | 11/17/2016 | 11/17/2016 | A | PASS |
Jim Page
|
|
|
Previously noted items have been repaired in regards to the pipe tenting, documentation had not been received for the foam type insulation at time of inspection, overhead fire sprinkler piping will be approved for cover, if documentation does not support compatability with CPVC then a necessary repair/replacement of piping will be required. Overhead fire sprinkler piping approved for cover at general contractors discretion.
|
INSP-Sprinkler Rough-in | 11/15/2016 | 11/15/2016 | 11/15/2016 | P | FAIL |
Troy Cobbley
|
|
|
I pointed out several locations where tenting needed modified which included in the Master Bedroom and a vertical piece of pipe on the second floor above the Master Bedroom. Also a letter is needed that states the spray on foam insulation is compatible with the cpvc piping. I noted that the spray on foam has been sprayed behind as well as on top fo the piping. The building contractor, Bob, stated that there is adequate insulation behind the piping and the foam on the interior side of the piping is not detrimental to heat transfer. Another cover inspection is needed with the above corrections prior to covering the piping.
|
INSP-Sprinkler Rough-in | 10/13/2016 | 10/14/2016 | 10/14/2016 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping complete, overhead fire sprinkler piping located between levels approved for cover, fire sprinkler piping located in attic spaces cannot be covered until tenting insualtion is installed.
|
Sprinkler Plan Check | 6/17/2016 | | 6/17/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/17/2016 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 6/17/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/17/2016 | | 6/17/2016 | | DONE |
Carlos Velazquez
|
|
|
|
Intake Approval | | | 6/15/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 6/15/2016 | | 6/15/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/15/2016 | | 6/15/2016 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 6/15/2016 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 6/15/2016 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 5/16/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 16 2016 12:26PM
|