INSP-Final Inspection | 1/17/2017 | 1/18/2017 | 1/18/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 1/12/2017 | 1/13/2017 | 1/13/2017 | A | FAIL |
Troy Cobbley
|
|
|
Need to change the programing of the pre-action release panel to delete the 30 countdown as discussed. All other items have been tested.
|
INSP-Final Inspection | 1/9/2017 | 1/10/2017 | 1/10/2017 | A | FAIL |
Troy Cobbley
|
|
|
Resubmit plans showing the corrected alarm activation as per discussion and address all of the items listed in the review comments. Provide "abort" outside of the room as per review note #4. provide signage and door sweep as per discussion. Raise the first and third floor nozzles to within 12" of ceiling as per notes on plans. All three wall mounted strobes are overspaced. Provide ceiling in the first floor "releasing panel room". We need to test all of the devices. Get approval to relocate the manual pull station to the inside of the room.
|
Telephone call | | | 1/10/2017 | | DONE |
|
|
|
Simplex tech called to indicate they had incorrectly noted the correct sequence of operation for the suppressions systems. He said that the first detector is to be an alarm condition by itself but the solenoid would not activate. It would also require a low air condition. As this is the only additional item added to the initial review comments, I allowed them to supply as built drawings rather than resubmit.
|
INSP-Final Inspection | 1/3/2017 | 1/6/2017 | 1/6/2017 | A | CANC |
Troy Cobbley
|
|
|
As early as possible Phone #: 2089414511 >> Inspection requested via mobile web by Nathan Price Inspection cancelled via mobile web on Friday, January 06, 2017.
|
Plan Modification Accepted | | | 12/28/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 12/28/2016 | | DONE |
|
|
|
Plan mod received.
|
Alarm Plan Check | 12/28/2016 | | 12/28/2016 | | PASS |
Lee G Meredith
|
|
|
Plan modification shows a replacement of originally planned control panel with a different one. All other information appears to be unchanged from previously approved design.
|
PLANS TAKEN FRONT DESK ALARM | | | 12/28/2016 | | DONE |
|
|
|
Plan modification approved with no additional review comments.
|
CHANGE STATUS TO (ISS) | | | 12/28/2016 | | DONE |
Christina Prado
|
|
|
|
Miscellaneous action | | | 12/27/2016 | | DONE |
|
|
|
Dante emailed a requres to reopen the project for a plan modification submittal.
|
Sprinkler Plan Check | 9/2/2016 | | 9/2/2016 | | PASS |
Tim Frost
|
|
|
|
Alarm Plan Check | 9/2/2016 | | 9/2/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/2/2016 | | DONE |
|
|
|
Plan modification approved. No additional review comments.
|
Permit Ready to Issue | | | 9/2/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/2/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/2/2016 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 8/31/2016 | | DONE |
|
|
|
Plan mod received.
|
CHANGE STATUS TO (REV) | | | 8/31/2016 | | DONE |
|
|
|
Changed status to REV for plan modification.
|
Miscellaneous action | | | 8/30/2016 | | DONE |
|
|
|
Re-opened for a plan modification per Dante's request.
|
1st review completed | | | 5/23/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 5/23/2016 | | 5/23/2016 | | PASS |
Lee G Meredith
|
|
|
Detection reviewed by Lee Meredith, suppression reviewed by Tim Frost.
|
PLANS TAKEN FRONT DESK ALARM | | | 5/23/2016 | | DONE |
|
|
|
Plans approved with review comments and drawing notation.
|
Permit Ready to Issue | | | 5/23/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/23/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/23/2016 | | 5/23/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 5/17/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 17 2016 7:52AM
|
Plan assigned to (Lee) | 5/17/2016 | | 5/17/2016 | | DONE |
Lee G Meredith
|
|
|
|