INSP-Final Inspection | 8/30/2016 | 8/31/2016 | 8/31/2016 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 8/5/2016 | 8/5/2016 | 8/5/2016 | P | PASS |
Jim Page
|
|
|
24 hour air test for new dry system passed/complete
|
INSP-Sprinkler Rough-in | 8/5/2016 | 8/8/2016 | 8/5/2016 | A | CANC |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 8/4/2016 | 8/4/2016 | 8/4/2016 | P | PART |
Jim Page
|
|
|
24 hour air test started at 3:00 pm.
|
INSP-Sprinkler Rough-in | 7/27/2016 | 7/28/2016 | 7/28/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping located above ceiling grid area's complete, overhead fire sprinkler piping located above ceiling grid area's from middle of tenant space north approved for cover.
|
Sprinkler Plan Check | 6/8/2016 | | 6/8/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/8/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/8/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/8/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/8/2016 | | 6/8/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 5/31/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 5/31/2016 | | 5/31/2016 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/31/2016 | | PEND |
|
|
|
Everything is Ok except maybe the idle pallet storage. All stamped waiting on letter indicating he is ok with the idle pallet storage described on the drawing.
|
Application received | | | 5/20/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 20 2016 11:07AM
|