INSP-Final Inspection | 5/23/2016 | 5/24/2016 | 5/24/2016 | A | PASS |
Jim Page
|
|
|
Previously noted items addressed/repaired, final fire alarm inspection passed/complete
|
INSP-Final Inspection | 5/20/2016 | 5/23/2016 | 5/23/2016 | A | FAIL |
Troy Cobbley
|
|
|
I tested the interconnect with the hood supression system and that reported to the facp. But there were no approved plans on site. Also per the contractor the two duct smoke detectors included on the scope of work have been deleted so prior to a final sign off I need as-builts to Lee and city approved plans to verify installation.
|
Application received | | | 5/20/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 20 2016 12:15PM
|
Plan assigned to (Lee) | 5/20/2016 | | 5/20/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 5/20/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 5/20/2016 | | 5/20/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/20/2016 | | DONE |
|
|
|
Quick permit approved with review comments.
|
Permit Ready to Issue | | | 5/20/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/20/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/20/2016 | | 5/20/2016 | | DONE |
Christina Prado
|
|
|
|