INSP-Final Inspection | 9/28/2016 | 9/29/2016 | 9/29/2016 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 9/28/2016 | 9/29/2016 | 9/28/2016 | P | CANC |
Jim Page
|
|
|
Contact is Sean. Phone #: ###-#### >> Inspection requested via web by Morgan Ahten Inspection cancelled from web by: Morgan Ahten
|
INSP-Final Inspection | 9/15/2016 | 9/16/2016 | 9/16/2016 | P | FAIL |
Troy Cobbley
|
|
|
Provide updated map at the FACP showing the location and device count of the new portable, provide transient protection per NFPA 72 12.2.4.2 and NFPA 70 article 760, provide as-builts to plan review showing the communication method (alarm/trouble circuit) to the existing Simplex panel in the main school building. Include data sheet for suppression method.
|
Plan assigned to (Lee) | 6/10/2016 | | 6/10/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 6/10/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 6/10/2016 | | 6/10/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 6/10/2016 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 6/10/2016 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 6/10/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/10/2016 | | 6/10/2016 | | DONE |
Carlos Velazquez
|
|
|
|
Application received | | | 5/31/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 31 2016 12:47PM
|