Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR16-00365
StatusFinaled
Name STATEFIRE DC SPECIALTIES
Site Address 800 W MAIN ST Unit: 920
Project NameP&G New Sales Office
Customer Number 
ePlanReviewYes
Description
[P & G Office - 9th Story - Suite 920] - Quick Permit
36 sprinkler tenant build-out on the 9th floor of the 8th & Main tower. Add QR SSPs to new ACT. PIpe from existing 1" outlets for sprig-ups.

(P&G – 9TH STORY - SUITE 920) Fire sprinklers used for high rise. To create a new 4,257 square foot tenant space, this tenant space is on the 9th story of a new high rise building. Work is to include: removal of select wall for new door opening, removal of select door/door frame for new door with sidelight, construction of select interior nonbearing walls to create a conference room, a breakroom, (4) huddle rooms, a mother’s room, a communications room, a storage room, a copy/mail room, open office area and a vestibule, new sink at breakroom, new acoustic suspended ceiling, new light fixtures, electrical work, plumbing work, mechanical work and finishes that meet chapter 8 of the IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/4/20168/4/20168/4/2016PPASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Sprinkler Rough-in7/21/20167/21/20167/21/2016PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping per this scope of work complete, overhead fire sprinkler piping per this scope of work approved for cover.
Permit Ready to Issue  6/7/2016 DONE
Issue and Print Permit  6/7/2016 DONE
Inspection Record Card- Fire6/7/2016 6/7/2016 DONE
DetailsCandy A. Nichols
Intake Approval  6/2/2016 PASS
Plan assigned to (Tim)6/2/2016 6/2/2016 DONE
DetailsTim Frost
Sprinkler Plan Check6/2/2016 6/2/2016 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  6/2/2016 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  6/2/2016 DONE
DetailsTim Frost
Application received  6/1/2016 DONE
Application submitted via PDS Online on Jun 1 2016 4:46PM