INSP-Final Inspection | 2/28/2018 | 3/1/2018 | 3/1/2018 | P | CANC |
Jim Page
|
|
|
Call prior to going Phone #: 2089411846 >> Inspection requested via mobile web by SVC Brian A
|
INSP-Final Inspection | 3/1/2018 | 3/1/2018 | 3/1/2018 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection complete.
|
INSP-Final Inspection | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | CANC |
Jim Page
|
|
|
As late as possible Phone #: 2089411846 >> Inspection requested via mobile web by SVC Brian A Inspection cancelled via mobile web on Wednesday, February 28, 2018.
|
INSP-Alarm Testing | 2/9/2018 | 2/9/2018 | 2/9/2018 | P | DONE |
Jim Page
|
|
|
Fire alarm testing for levels 3 and 4 complete.
|
INSP-Alarm Testing | 1/30/2018 | 1/30/2018 | 1/30/2018 | P | DONE |
Jim Page
|
|
|
Fire alarm testing for stairwell number 2 pressurization complete.
|
INSP-Alarm Testing | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | DONE |
Jim Page
|
|
|
Fire alarm testing complete for level 1 lobby and level 2 common areas. Additional notification needed for level 1.5 southside of garage.
|
INSP-Alarm Testing | 1/26/2018 | 1/26/2018 | 1/26/2018 | P | PART |
Jim Page
|
|
|
Fire alarm testing for levels 5 and 6 complete.
|
INSP-Alarm Testing | 1/23/2018 | 1/23/2018 | 1/23/2018 | P | DONE |
Jim Page
|
|
|
More fire alarm testing needs to happen on level 6 before TCO
|
INSP-Alarm Testing | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | DONE |
Jim Page
|
|
|
Fire alarm inspection/testing for level 7 complete.
|
INSP-Alarm Testing | 1/9/2018 | 1/16/2018 | 1/16/2018 | A | CANC |
Jim Page
|
|
|
Call prior to going Phone #: 2089411846 >> Inspection requested via mobile web by SVC Brian A Inspection cancelled via mobile web on Tuesday, January 16, 2018.
|
CHANGE STATUS TO (ISS) | | | 10/10/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/10/2017 | | DONE |
|
|
|
|
Alarm Plan Check | 10/9/2017 | | 10/9/2017 | | PASS |
Lee G Meredith
|
|
|
Plans approved as noted in the review comments and notes on drawing FA-502.
|
PLANS TAKEN FRONT DESK ALARM | | | 10/9/2017 | | DONE |
|
|
|
Plan modification approved as noted.
|
Permit Ready to Issue | | | 10/9/2017 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 10/6/2017 | | DONE |
|
|
|
|
Miscellaneous action | | | 10/6/2017 | | DONE |
|
|
|
Emailed John to ask if stairwell fan status lights showed the actual status of the control switches or th actual fans run status. He replied to with a mechanical drawing showing the interface of lights, switches and relaysthat explains most functions.
|
Miscellaneous action | | | 9/25/2017 | | DONE |
|
|
|
John Haber emailed to ask if smoke detectors are allowed in the garage. I informe him that unless enclosed in a tempered vestibule or room that they are not. Heat detector is required.
|
INSP-Alarm Testing | 9/18/2017 | 9/20/2017 | 9/20/2017 | A | PART |
Jim Page
|
|
|
Fire alarm testing complete for fire pump riser room/fire pump room dry systems (Parking levels 1 and 2 dry systems). All tampers and flow switches in fire pump room complete, fire pump monitoring complete, tampers and flows complete for levels 1 and 2 wet systems.
|
Telephone call | | | 9/15/2017 | | DONE |
|
|
|
Dante requested this workflow be reopened for a plan modification.
|
INSP-Alarm Testing | 9/14/2017 | 9/14/2017 | 9/14/2017 | P | DONE |
Troy Cobbley
|
|
|
Today I verified the panel, batteries, phone lines, phone line troubles, battery troubles and smoke detector over the panel. Most other devices have not been connected to the main fire alarm panel. I was unable to test the hood suppression system and a/v's in the Pizza tenant due to the approved plans for the space not being on site. I also pointed out the a plan modification is needed for the new devices (fire pump) and deletion of devices. Also a plan modification is needed for stair shaft pressurization as noted on the city approved fire alarm plans.
|
Inspection Record Card- Fire | 6/29/2016 | | 6/29/2016 | | DONE |
Brittany Hill
|
|
|
|
(F) Reprint permit | | | 6/29/2016 | | DONE |
|
|
|
|
1st review completed | | | 6/23/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 6/23/2016 | | 6/23/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 6/23/2016 | | DONE |
|
|
|
Plans approved with review comments and noted requirements on the drawings.
|
Permit Ready to Issue | | | 6/23/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/23/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/23/2016 | | 6/23/2016 | | DONE |
Candy A. Nichols
|
|
|
|
Plan assigned to (Lee) | 6/13/2016 | | 6/13/2016 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 6/13/2016 | | DONE |
|
|
|
Informed Dante that an approved design alternate provides for a pressurization fan in stairwell 2 and that it will need to meet the requirements of IFC / IBC section 909. This is not shown on any of the 4 different phase submittals. I emailed him a copy of the approved alternate as a reference. He will go over this with the engineer of record to determine how they want to handle this.
|
Application received | | | 6/9/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 9 2016 10:55AM
|