INSP-Final Inspection | 6/23/2016 | 6/23/2016 | 6/23/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Final Inspection | 6/22/2016 | 6/22/2016 | 6/22/2016 | P | PART |
Jim Page
|
|
|
Inspection complete for overhead fire sprinkler modifications. Fire sprinkler system associated with this tenant space does not have current inspection tags, permit cannot be finaled until documentation has been provided showing that the sprinkler system have had an annual inspection performed.
|
INSP-Sprinkler Rough-in | 6/22/2016 | 6/22/2016 | 6/22/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection complete for overhead fire sprinkler piping, overhead fire sprinkler piping approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 6/22/2016 | 6/22/2016 | 6/22/2016 | P | CANC |
Troy Cobbley
|
|
|
Jim Danes is contact. Please advise if able to come earlier than PM. Phone #: ###-#### >> Inspection requested via web by Connie Danes Inspection cancelled from web by: Connie Danes
|
Permit Ready to Issue | | | 6/20/2016 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 6/20/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/20/2016 | | 6/20/2016 | | DONE |
Carlos Velazquez
|
|
|
|
Application received | | | 6/17/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 17 2016 10:14AM
|
Intake Approval | | | 6/17/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 6/17/2016 | | 6/17/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/17/2016 | | 6/17/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/17/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2016 | | DONE |
Tim Frost
|
|
|
|