INSP-Final Inspection | 7/28/2016 | 7/28/2016 | 7/28/2016 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 7/27/2016 | 7/27/2016 | 7/27/2016 | P | FAIL |
Troy Cobbley
|
|
|
Need as-builts and audio and visuals to sync.
|
Telephone call | | | 7/27/2016 | | DONE |
|
|
|
Returned a phone call to Jack Schmidt. He stated that the inspector requried an increase in notification candela for a device that had been installed in a different location than shown on the approved drawings. Based on head room shown on the approved calculations, only as built drawings will be required. Jack is to email them directly to me.
|
Permit Ready to Issue | | | 6/29/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/29/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/29/2016 | | 6/29/2016 | | DONE |
Christina Prado
|
|
|
|
Alarm Plan Check | 6/27/2016 | | 6/27/2016 | | PASS |
Lee G Meredith
|
|
|
Previous upload was adequate after discussing ceiling heights of production room with Jack.
|
PLANS TAKEN FRONT DESK ALARM | | | 6/27/2016 | | DONE |
|
|
|
Plans approved with review comments.
|
Alarm Plan Check | 6/24/2016 | | 6/24/2016 | | FAIL |
Lee G Meredith
|
|
|
Candela still inadequate in some areas, as noted on the drawings. See 2nd review comments.
|
Plan resubmittals received | | | 6/23/2016 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 6/22/2016 | | 6/22/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 6/22/2016 | | FAIL |
|
|
|
See 1st review comments.
|
Application received | | | 6/21/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 21 2016 10:10AM
|
Miscellaneous action | | | 6/21/2016 | | DONE |
|
|
|
Ceiling heights and a scale graph were not shown on the drawings. Also, multiple drawings were uploaded as a single file. I emailed Jack to have him email corrections. These corrections were received and inserted.
|