INSP-Final Inspection | 7/25/2016 | 7/25/2016 | 7/25/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 6/30/2016 | 6/30/2016 | 6/30/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinklers complete, overhead fire sprinklers approved for cover.
|
Intake Approval | | | 6/23/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 6/23/2016 | | 6/23/2016 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 6/23/2016 | | DONE |
|
|
|
The hydraulic indicated a demand exceeding 175#. I assume there is a PRV set for 175 Psi. There was a substantial cushion. I adjusted the demand down. There was still a cushion of 16.67 Psi after the adjustments
|
Sprinkler Plan Check | 6/23/2016 | | 6/23/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/23/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/23/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/23/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/23/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/23/2016 | | 6/23/2016 | | DONE |
Brittany Hill
|
|
|
|
Application received | | | 6/22/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 22 2016 9:43AM
|