Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberFIR16-00406
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 8485 W USTICK RD
Project NameBoise Fire Station #4
Customer NumberUDG ONLY
ePlanReviewYes
Description
[City of Boise Fire Station #4 - Udg Only] - Quick Permit
Underground for Fire Station #4 at 8485 W. Ustick Road. Excavation, 6" C900, and thrust blocks

BLD16-01040 - Permit to construct a new 13,774 square foot fire station. This building is fire sprinklered for area increase and non-separated uses. This building utilizes enhanced lighting to comply with the 2012 IECC / IgCC. Scope of work includes: construction of poured concrete foundation, construction of reinforced CMU exterior walls, construction of new steel bar-joist floor – ceiling framing / steel pan deck, [construction of interior nonbearing walls to create: 10 sleeping units, 8 restrooms / bathing rooms, lobby, two offices, work room, turn out room, decon room, maintenance shop, riser room, SCBA Fill room, 3 storage rooms, laundry room, janitors closet, training classroom, fitness room, and dayroom], new elevator, new electrical, new plumbing, new mechanical, new interior / exterior finishes, new accessible doors / hardware, covered patio on 2nd floor, and related site work. This building is fully fire sprinklered for area increase. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/24/20175/25/20175/25/2017APASS
DetailsTroy Cobbley
permit finaled
INSP-Supply line flush2/23/20172/27/20172/27/2017APASS
DetailsTroy Cobbley
Underground flush passed
INSP-Sprinkler Rough-in/Hydro2/15/20172/15/20172/15/2017PPASS
DetailsTroy Cobbley
The underground hydro test passed
INSP-Sprinkler Rough-in9/21/20169/22/20169/22/2016APASS
DetailsTroy Cobbley
Remaining underground piping is ok to cover.
Plan assigned to (Tim)8/31/2016 9/6/2016 DONE
DetailsTim Frost
This project requires a plan mod. Shilo Automatic Sprinkler, Inc. has made changes to the approved drawing removing the one-hour rated room and adding a wall PIV.
Plan Modification Accepted  9/6/2016 DONE
Plan assigned to (Tim)9/6/2016 9/6/2016 DONE
DetailsTim Frost
Sprinkler Plan Check9/6/2016 9/6/2016 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  9/6/2016 DONE
CHANGE STATUS TO (ISS)  9/6/2016 DONE
no fees per Tim Frost
(F) Reprint permit  9/6/2016 DONE
INSP-Sprinkler Rough-in7/13/20167/13/20167/13/2016PPART
DetailsTroy Cobbley
Todays inspection was just for the stub out from the building. Top of pipe measured 4'-2" to the top of the footing. Per the job superintendant and the underground installer an additional 12" of dirt is to be installed on top of the pipe. This will give the required 4'-6" of cover.
Sprinkler Plan Check6/24/2016 6/24/2016 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  6/24/2016 DONE
DetailsTim Frost
Permit Ready to Issue  6/24/2016 DONE
all requirments met
Issue and Print Permit  6/24/2016 DONE
Inspection Record Card- Fire6/24/2016 6/24/2016 DONE
DetailsCarlos Velazquez
Intake Approval  6/23/2016 PASS
Plan assigned to (Tim)6/23/2016 6/23/2016 DONE
DetailsTim Frost
Sprinkler Plan Check6/23/2016 6/23/2016 FAIL
DetailsTim Frost
1st review completed  6/23/2016 FAIL
DetailsTim Frost
Application received  6/22/2016 DONE
Application submitted via PDS Online on Jun 22 2016 2:16PM