INSP-Final Inspection | 7/13/2016 | 7/14/2016 | 7/14/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 7/13/2016 | 7/14/2016 | 7/14/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection complete for overhead fire sprinkler piping, overhead fire sprinkler piping approved for cover.
|
INSP-Final Inspection | 7/12/2016 | 7/13/2016 | 7/13/2016 | A | CANC |
Troy Cobbley
|
|
|
Jim Danes is contact. Please let him know at least half an hour in advance of inspection so he can be there if needed. Phone #: ###-#### >> Inspection requested via web by Connie Danes Inspection cancelled from web by: Connie Danes
|
INSP-Sprinkler Rough-in | 7/12/2016 | 7/13/2016 | 7/13/2016 | A | FAIL |
Troy Cobbley
|
|
|
A single pendant head located above the cooler has not been installed per plan which made it overspaced. All other work looks ok and piping can be covered.
|
Intake Approval | | | 6/28/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 6/28/2016 | | 6/28/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/28/2016 | | 6/28/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/28/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/28/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/28/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/28/2016 | | 6/28/2016 | | DONE |
Kristal Soland
|
|
|
|
Application received | | | 6/27/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 27 2016 4:53PM
|