Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR16-00422
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 250 E PARKCENTER BLVD
Project NameALBERTSONS G.O. PHASE 5
Customer Number 
ePlanReviewYes
Description
[Albertsons General Office - Phase 5]
INSTALL NEW PENDENT HEADS TO THE NEW CEILING AND WALL LOCATIONS.

[BLD16-01921] - This building is fully fire sprinklered for area increase and has 60 foot yards on all sides for unlimited area. Permit to remodel approx. 15,300 sq. ft. of existing office space. Approval is contingent upon adhering to the approved plans on file. Scope of work to include: removal of select interior nonbearing walls, construction of select interior nonbearing walls to create (5) offices and open work areas, relocate existing light fixtures, the mechanical system will remain and be modified to accommodate the new layout and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered for unlimited area building provisions Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/10/201610/10/201610/10/2016APASS
DetailsJim Page
Final fire sprinkler inspection for this area of work passed/complete.
INSP-Sprinkler Rough-in10/10/201610/10/201610/10/2016PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping for this area of work complete, overhead fire sprinkler piping for this area of work approved for cover.
Intake Approval  6/30/2016 PASS
Plan assigned to (Tim)6/30/2016 6/30/2016 DONE
DetailsTim Frost
Sprinkler Plan Check6/30/2016 6/30/2016 PASS
DetailsTim Frost
No written review
1st review completed  6/30/2016 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  6/30/2016 DONE
DetailsTim Frost
Permit Ready to Issue  6/30/2016 DONE
Issue and Print Permit  6/30/2016 DONE
Inspection Record Card- Fire6/30/2016 6/30/2016 DONE
DetailsKristal Soland
Application received  6/29/2016 DONE
Application submitted via PDS Online on Jun 29 2016 8:12AM