INSP-Final Inspection | 12/12/2016 | 12/13/2016 | 12/13/2016 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 12/12/2016 | 12/12/2016 | 12/12/2016 | P | CANC |
Troy Cobbley
|
|
|
Robert Phone #: ###-####
|
INSP-Sprinkler Rough-in | 9/28/2016 | 9/29/2016 | 9/29/2016 | A | PASS |
Troy Cobbley
|
|
|
Tenting re-inspection passed. Piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 9/27/2016 | 9/28/2016 | 9/28/2016 | A | FAIL |
Troy Cobbley
|
|
|
Rough-in passed. Tenting failed. No piping to be covered. Red tag stating such posted.
|
INSP-Sprinkler Rough-in/Hydro | 9/23/2016 | 9/26/2016 | 9/26/2016 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro tests passed.
|
INSP-Sprinkler Rough-in/Hydro | 8/4/2016 | 8/4/2016 | 8/4/2016 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in | 7/27/2016 | 7/28/2016 | 7/28/2016 | P | CANC |
Troy Cobbley
|
|
|
Wrong FIR permit scheduled
|
INSP-Conference | 7/27/2016 | 7/28/2016 | 7/28/2016 | A | CANC |
Troy Cobbley
|
|
|
Wrong inspection type scheduled
|
Permit Ready to Issue | | | 7/11/2016 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 7/11/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/11/2016 | | 7/11/2016 | | DONE |
Carlos Velazquez
|
|
|
|
Intake Approval | | | 7/6/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 7/6/2016 | | 7/6/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/6/2016 | | 7/6/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/6/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2016 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 7/2/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 2 2016 10:13AM
|