INSP-Final Inspection | 12/8/2016 | 12/12/2016 | 12/12/2016 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 12/6/2016 | 12/7/2016 | 12/7/2016 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 10/31/2016 | 11/2/2016 | 11/2/2016 | P | PASS |
Troy Cobbley
|
|
|
Tenting passed. Piping can be covered.
|
INSP-Sprinkler Rough-in | 10/24/2016 | 10/25/2016 | 10/25/2016 | A | PART |
Troy Cobbley
|
|
|
Rough-in passed. Tenting failed. No piping to be covered until the tenting inspection passes.
|
INSP-Sprinkler Rough-in | 10/21/2016 | 10/24/2016 | 10/24/2016 | A | FAIL |
Troy Cobbley
|
|
|
There were no city approved plans on site, tenting was not adequate in all four of the apartments. No piping can be covered.
|
Issue and Print Permit | | | 7/26/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/26/2016 | | 7/26/2016 | | DONE |
Brittany Hill
|
|
|
|
Sprinkler Plan Check | 7/20/2016 | | 7/20/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/2016 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 7/8/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 7/8/2016 | | 7/8/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/8/2016 | | 7/8/2016 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 7/8/2016 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/8/2016 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 7/6/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 6 2016 10:34AM
|