INSP-Final Inspection | 12/8/2016 | 12/12/2016 | 12/12/2016 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 11/30/2016 | 12/1/2016 | 12/1/2016 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Sprinkler Rough-in | 9/16/2016 | 9/19/2016 | 9/19/2016 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Tenting passed. Piping can be covered. Riser has not been built yet. Need as-builts showing the pipe routing changes. Fitting counts are the same
|
CHANGE STATUS TO (ISS) | | | 7/28/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/28/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/28/2016 | | 7/28/2016 | | DONE |
Brittany Hill
|
|
|
|
Intake Approval | | | 7/21/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 7/21/2016 | | 7/21/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/21/2016 | | 7/21/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/21/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/21/2016 | | DONE |
Tim Frost
|
|
|
|
Issue and Print Permit | | | 7/21/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/21/2016 | | 7/21/2016 | | DONE |
Brittany Hill
|
|
|
|
Permit Ready to Issue | | | 7/21/2016 | | DONE |
|
|
|
DO NOT ISSUE JUST CHANGE TO ISS STATUS
|
Application received | | | 7/6/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 6 2016 10:37AM
|