INSP-Final Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed/complete.
|
INSP-Alarm Testing | 8/12/2016 | 8/15/2016 | 8/15/2016 | A | CANC |
Jim Page
|
|
|
Inspection request was for a final fire alarm inspection, not testing. This inspection request cancelled and the correct inspection request will be generated.
|
INSP-Final Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 | A | PART |
Jim Page
|
|
|
Final fire alarm inspection for area of work on level 4 passed/complete, remaining area of work associated with this permit to be completed at a later date.
|
INSP-Sprinkler Rough-in/Hydro | 8/2/2016 | 8/3/2016 | 8/3/2016 | A | CANC |
Jim Page
|
|
|
Inspection request is for a partial final for this permit, not sprinkler related. This inspection request cancelled and the correct inspection request will be generated.
|
Permit Ready to Issue | | | 7/15/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/15/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/15/2016 | | 7/15/2016 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Lee) | 7/14/2016 | | 7/14/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 7/14/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 7/14/2016 | | 7/14/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 7/14/2016 | | DONE |
|
|
|
Plans approved with review comments.
|
Application received | | | 7/13/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 13 2016 2:52PM
|