INSP-Final Inspection | 9/1/2016 | 9/2/2016 | 9/2/2016 | A | PASS |
Jim Page
|
|
|
Previously noted items have been repaired/addressed, final fire alarm inspection passed/complete.
|
Miscellaneous action | | | 9/1/2016 | | DONE |
|
|
|
Plan modification uploaded by Rose.
|
CHANGE STATUS TO (REV) | | | 9/1/2016 | | DONE |
|
|
|
Changed status to REV due to upload of plan modification
|
Miscellaneous action | | | 9/1/2016 | | DONE |
|
|
|
Emailed Rose to let her know that product data was missing for the added notificaiton power supply. She emailed the product data after that.
|
Alarm Plan Check | 9/1/2016 | | 9/1/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/1/2016 | | DONE |
|
|
|
Plans approved. No additional review comments.
|
CHANGE STATUS TO (ISS) | | | 9/1/2016 | | DONE |
|
|
|
|
INSP-Final Inspection | 8/30/2016 | 8/31/2016 | 8/31/2016 | A | FAIL |
Troy Cobbley
|
|
|
Resubmit plans showing the wire guage change, added strobes, changed candellas. Plans need to address the different NAC panel. I did test the sync which was ok. I did test the interconnection with the new dry pipe riser which was ok. I did not test the duct smoke detectors. Per general contractor security is being installed on the doors but will not hinder exiting in a single motion.
|
Miscellaneous action | | | 8/31/2016 | | DONE |
|
|
|
Rose requested I reopen the work flow so she can upload a plan modification as directed by the inspector.
|
INSP-Final Inspection | 8/29/2016 | 8/31/2016 | 8/30/2016 | P | CANC |
Jim Page
|
|
|
Location Access: site is open Installation Technician: Ray McQueen Phone #: ###-#### >> Inspection requested via web by Rose Peterson Inspection cancelled from web by: Rose Peterson
|
Plan resubmittals received | | | 7/21/2016 | | DONE |
|
|
|
|
Alarm Plan Check | 7/21/2016 | | 7/21/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 7/21/2016 | | DONE |
|
|
|
Resubmittal approved with review comments.
|
Issue and Print Permit | | | 7/21/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/21/2016 | | 7/21/2016 | | DONE |
Brittany Hill
|
|
|
|
Miscellaneous action | | | 7/19/2016 | | DONE |
|
|
|
Emailed Rose rquesting ceiling heights in open areas.
|
Plan assigned to (Lee) | 7/19/2016 | | 7/19/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 7/19/2016 | | FAIL |
|
|
|
Failed pre-screen review. See drawing notation. Rose Peterson notified via email.
|
Application received | | | 7/14/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 14 2016 3:24PM
|