INSP-Final Inspection | 7/29/2016 | 7/29/2016 | 7/29/2016 | P | FAIL |
Troy Cobbley
|
|
|
The new horn/strobes are not utilizing the temporal 3 pattern. Also there is a ground fault on the fire alarm system. If the ground fault is caused by the new devices it needs to be repaired prior to a final sign off.
|
INSP-Final Inspection | 7/29/2016 | 8/1/2016 | 7/29/2016 | A | PASS |
Jim Page
|
|
|
Reinspection items corrected. Scope of Work complete. Permit Finaled.
|
Miscellaneous action | | | 7/29/2016 | | DONE |
|
|
|
Rob emailed new cut sheets and revised calcs to correct sync deficiencies noted earlier.
|
Permit Ready to Issue | | | 7/19/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/19/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/19/2016 | | 7/19/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 7/18/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 18 2016 12:28PM
|
Plan assigned to (Lee) | 7/18/2016 | | 7/18/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 7/18/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 7/18/2016 | | 7/18/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 7/18/2016 | | DONE |
|
|
|
Plans approved with review comments.
|