Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR16-00466
StatusFinaled
Name SIMPLEX GRINNELL
Site Address 245 S CAPITOL BLVD
Project NameGROVE HOTEL 2ND FLR HALLWAY
Customer Number 
ePlanReviewYes
Description
[Grove Hotel 2nd Flr Hallway] - Quick Permit
Scope of work is to add one fire sprinkler head and relocate one due to the relocation/addition of new walls. Existing Fire Sprinkler System in the are to tie to.

[BLD16-01914] - Permit for tenant improvements on the 2nd and 3rd stories with work to include the removal of two interior nonbearing walls in suites 213, 214 and 215 to combine the suites and the installation of new doors between suites 302 and 303, 304 and 305, 306 and 307, 308 and 309, 310 and 311, 312 and 313 and suites 314 and 315. The interior nonbearing walls between suites 221 and 222 and 227 and 228 are also being removed for two larger suites. The new connecting doors are indicated as one hour doors. One additional door is being added at the corridor which is a 20 minute door. All work per the approved plans. This is a fully fire sprinklered building because it is a high rise. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/21/20167/21/20167/21/2016PPASS
DetailsJim Page
Final fire sprinkler inspection passed/complete.
Intake Approval  7/19/2016 PASS
Plan assigned to (Tim)7/19/2016 7/19/2016 DONE
DetailsTim Frost
Sprinkler Plan Check7/19/2016 7/19/2016 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  7/19/2016 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  7/19/2016 DONE
DetailsTim Frost
Permit Ready to Issue  7/19/2016 DONE
all requirments met
Issue and Print Permit  7/19/2016 DONE
Inspection Record Card- Fire7/19/2016 7/19/2016 DONE
DetailsCarlos Velazquez
Application received  7/18/2016 DONE
Application submitted via PDS Online on Jul 18 2016 2:11PM