Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR16-00480
StatusFinaled
Name STATEFIRE DC SPECIALTIES
Site Address 5493 E WARM SPRINGS AVE
Project NameRiverstone Middle+High School
Customer NumberUDG ONLY
ePlanReviewYes
Description
[Riverstone Middle + High School - Udg Only] - Quick Permit
7,000 sq ft Classroom addition to replace two modular buildings.

[BLD16-00810] - Permit is to construct a new 7,000 square foot middle / high school. This building is being sprinklered for non-rated corridors and future expansions. Approval contingent upon adhering to the approved plans on file. Work to include: removal of two existing portable classroom buildings, removal of two existing canopys on separate adjacent buildings, construction of poured concrete foundation, construction of new wood frame building, [installation of new nonbearing walls to create five classrooms, two storage rooms, separate sex accessible restrooms, two offices, a hallway, and a small break out classroom], new electrical, new mechanical, new plumbing, and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/2/201612/2/201612/2/2016APASS
DetailsJim Page
Final underground inspection passed/complete
INSP-Supply line flush11/28/201611/29/201611/29/2016ADONE
DetailsJim Page
Underground supply line flush complete
INSP-Sprinkler Rough-in/Hydro11/18/201611/18/201611/18/2016PPASS
DetailsJim Page
Underground hydrostatic test complete
INSP-Sprinkler Rough-in10/21/201610/24/201610/24/2016ACANC
DetailsJim Page
This FIR permit is for underground supply, inspection request is for rough in inspection for overhead fire sprinkler piping (FIR16-00534). This inspection request is cancelled and the correct permit has been shceduled.
INSP-Sprinkler Rough-in9/2/20169/6/20169/6/2016APASS
DetailsJim Page
Rough to cover inspection for underground main supply complete, underground main supply approved for cover.
INSP-Sprinkler Rough-in/Hydro7/28/20167/29/20167/29/2016PPART
DetailsJim Page
Partial rough to cover inspection complete for underground supply, underground approved for cover from the water supply to the PIV, after the PIV until the change of direction going to the building. Entire supply will be covered for equipment ramp and the remaining underground supply will be excavated and installed at later date.
Sprinkler Plan Check7/28/2016 7/28/2016 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  7/28/2016 DONE
DetailsTim Frost
Issue and Print Permit  7/28/2016 DONE
Inspection Record Card- Fire7/28/2016 7/28/2016 DONE
DetailsBrittany Hill
Intake Approval  7/25/2016 PASS
Plan assigned to (Tim)7/25/2016 7/25/2016 DONE
DetailsTim Frost
Sprinkler Plan Check7/25/2016 7/25/2016 FAIL
DetailsTim Frost
1st review completed  7/25/2016 FAIL
DetailsTim Frost
Application received  7/22/2016 DONE
Application submitted via PDS Online on Jul 22 2016 3:41PM