INSP-Final Inspection | 6/14/2017 | 6/14/2017 | 6/14/2017 | P | DONE |
Adele J Schaffeld-Griffin
|
|
|
UPGRADED COMPLETED UNDER BLD16-00820
|
DOC - Permit Finaled | | | 6/14/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
INSP-Final Inspection | 8/5/2016 | 8/5/2016 | 8/5/2016 | P | PASS |
Troy Cobbley
|
|
|
A temporary for two weeks is being given with Ron Johnsons approval until the fire alarm upgrade agreement has been finalized. *6/13/17* OK to final.
|
INSP-Final Inspection | 8/3/2016 | 8/3/2016 | 8/4/2016 | P | FAIL |
Troy Cobbley
|
|
|
Permit will be ok to final when directed by the Boise Fire Dept. An upgrade agreement is required for the fire alarm system.
|
Issue and Print Permit | | | 7/29/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/29/2016 | | 7/29/2016 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (Lee) | 7/28/2016 | | 7/28/2016 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 7/28/2016 | | DONE |
|
|
|
Emailed Damie a request for clairification regarding area of work, ceiling height, open area detail and triggering new booster panel. He responded to say that riser will be triggered by a notification module connected to the SLC, 8 foot ceilings, open area is actually enclosed offices and provided boundries of the area of work. New drawing was provided and inserted.
|
1st review completed | | | 7/28/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 7/28/2016 | | 7/28/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 7/28/2016 | | DONE |
|
|
|
Plans approved with review comments.
|
Application received | | | 7/26/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 26 2016 1:23PM
|