INSP-Final Inspection | 5/11/2017 | 5/11/2017 | 5/11/2017 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed/complete
|
INSP-Alarm Testing | 5/11/2017 | 5/11/2017 | 5/11/2017 | P | DONE |
Jim Page
|
|
|
Alarm testing complete
|
INSP-Final Inspection | 3/23/2017 | 3/24/2017 | 3/24/2017 | A | PART |
Jim Page
|
|
|
Partial final inspection for requested area's for TCO complete (Floors requested for TCO consist of levels 2 and 4) . Initiating devices on levels 1 through 4 have been tested and complete, audio issue has been resolved, A/V's have been inspected for levels 2, 3 and 4, level 1 and parking level will be inspected at a later date. Final fire alarm inspection for levels 2, 3 and 4 passed/complete.
|
INSP-Final Inspection | 3/23/2017 | 3/23/2017 | 3/23/2017 | P | PART |
Jim Page
|
|
|
Partial final inspection for fire alarms complete, all associated devices for fire sprinkler systems tested excluding heat trace monitoring, this will be verified on a later inspection. Audio visual devices inspected on levels 2, 3 and 4, had a noticable audio issue at time of inspection that has apparantly been repaired, will verify audio issue has been repaired on a later inspection.
|
Miscellaneous action | | | 3/2/2017 | | DONE |
|
|
|
Received as built drawings from Rob that indicate minor notification changes basement and on 4th floor.
|
Miscellaneous action | | | 8/2/2016 | | DONE |
|
|
|
Emailed Rob to see if remote paging is available at the annunciator in his design. He indicated that it was not but that he agreed it should be. He updated design and documents to include remote paging.
|
Plan assigned to (Lee) | 8/2/2016 | | 8/2/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 8/2/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 8/2/2016 | | 8/2/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/2/2016 | | DONE |
|
|
|
Plans approved with review comments and requirements.
|
Permit Ready to Issue | | | 8/2/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/2/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/2/2016 | | 8/2/2016 | | DONE |
Kristal Soland
|
|
|
|
Application received | | | 7/27/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 27 2016 1:30PM
|