INSP-Final Inspection | 8/30/2016 | 8/31/2016 | 8/31/2016 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 8/16/2016 | 8/17/2016 | 8/17/2016 | A | PASS |
Jim Page
|
|
|
200 psi hydrostatic test complete for dry system. Rough to cover inspection for dry system protecting the east side canopy complete, Overhead fire sprinkler piping located above hardlid in east side canopy approved for cover.
|
Permit Ready to Issue | | | 8/2/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/2/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/2/2016 | | 8/2/2016 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Lee) | 8/1/2016 | | 8/1/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 8/1/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 8/1/2016 | | 8/1/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/1/2016 | | DONE |
|
|
|
Quick permit approved. No review comments.
|
Application received | | | 7/31/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 31 2016 3:39AM
|