INSP-Final Inspection | 11/21/2016 | 11/21/2016 | 11/21/2016 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Alarm Testing | 11/21/2016 | 11/21/2016 | 11/21/2016 | P | DONE |
Troy Cobbley
|
|
|
Micheal Phone #: ###-####
|
Miscellaneous action | | | 9/23/2016 | | DONE |
|
|
|
Email with Stephanie. She wanted to know if as builts were adequate. I agreed to this. She submitted as built drawings and documents. Plan mod not required.
|
INSP-Final Inspection | 8/24/2016 | 8/25/2016 | 8/25/2016 | P | FAIL |
Troy Cobbley
|
|
|
No testing performed today due to agreement that additional work required for shunt trip will be added to the plans. Contractor to verify if as-builts or plan mods are acceptable.
Jordan Phone #: ###-####
|
Permit Ready to Issue | | | 8/3/2016 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 8/3/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/3/2016 | | 8/3/2016 | | DONE |
Carlos Velazquez
|
|
|
|
Plan assigned to (Lee) | 8/2/2016 | | 8/2/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 8/2/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 8/2/2016 | | 8/2/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/2/2016 | | DONE |
|
|
|
Quick permit approved. No review comments.
|
Application received | | | 8/1/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 1 2016 12:48PM
|