INSP-Final Inspection | 11/16/2017 | 11/16/2017 | 11/16/2017 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete.
|
INSP-Final Inspection | 11/16/2017 | 11/16/2017 | 11/16/2017 | P | FAIL |
Jim Page
|
|
|
Flow switch leaks when water is being flowed, flow switch will need to be replaced.
|
INSP-Final Inspection | 11/14/2017 | 11/15/2017 | 11/15/2017 | A | FAIL |
Jim Page
|
|
|
Upright head in riser room is to far down from the deck. Underground supply is not on so not testing of fire sprinkler associated devices could be tested (Underground valve must be turned on by SUEZ). Riser brace needs to be attached to the floor.
|
INSP-Sprinkler Rough-in | 9/25/2017 | 9/25/2017 | 9/25/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection complete, approved for cover.
|
INSP-Sprinkler Rough-in | 9/22/2017 | 9/22/2017 | 9/22/2017 | A | FAIL |
Jim Page
|
|
|
Multiple hangers are overspaced in garage area's, garage area's are not approved for cover, any cover material installed that blocks the veiw of fire sprinkler piping/hangers will be removed for follow up inspection.
|
INSP-Sprinkler Rough-in | 9/21/2017 | 9/22/2017 | 9/22/2017 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting on level 2 complete, level 2 approved for cover. Level 1 apartment on east side approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 10/12/2016 | 10/13/2016 | 10/13/2016 | P | PART |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping complete for levels 1 and 2. Rough to cover inspection for overhead fire sprinkler piping complete, overhead fire sprinkler piping located on level 1 approved for cover, overhead fire sprinkler piping located on level 2 cannot be covered until tenting inspection is complete. The 2nd level has a balcony that is not on the approved drawings, this balcony is on the southside of the building located on the end, balcony needs a dry sidewall install for coverage, sidewall install will be verified during tenting inspection.
|
Permit Ready to Issue | | | 8/9/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/9/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/9/2016 | | 8/9/2016 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 8/8/2016 | | 8/8/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
Plan resubmittals received | | | 8/8/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2016 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 8/4/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 8/4/2016 | | 8/4/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/4/2016 | | 8/4/2016 | | FAIL |
Tim Frost
|
|
|
|
Application received | | | 8/3/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 3 2016 10:39AM
|