INSP-Final Inspection | 10/11/2016 | 10/11/2016 | 10/11/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 10/11/2016 | 10/11/2016 | 10/11/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping complete.
|
INSP-Sprinkler Rough-in | 9/22/2016 | 9/23/2016 | 9/23/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping complete, overhead fire sprinkler piping approved for cover. Pendant head located in the dining area is less than 12 inches from heat source grid mounted heat register, sprinkler head will be changed from a 155 degree to a 200 degree.
|
Permit Ready to Issue | | | 8/9/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/9/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/9/2016 | | 8/9/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 8/8/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 8/8/2016 | | 8/8/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/8/2016 | | 8/8/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/8/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2016 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 8/5/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 5 2016 10:53AM
|