Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR16-00562
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 316 W WASHINGTON ST
Project NameS.L. DISPLACEMENTS-LITTLE LUKE
Customer Number 
ePlanReviewYes
Description
[Little Likes]
The fire sprinkler scope of work consists of installing new upright and pendent heads to the new wall and ceiling configuration. Replace all existing plastic pipe with new steel pipe in the remodel area. Convert existing pre-action system to a wet system.

[BLD16-02490] - The fire sprinkler system is used for building area increase and for occupancy. To create a 10,119 square foot child care facility (daycare) within an existing 20,100 square foot building. Work is to include 2 restrooms accessible to the disabled based on adult dimensions, 4 restrooms accessible to the disabled based on child dimensions, interior nonbearing walls, suspended acoustical ceilings, interior doors, interior windows, exterior storefront doors and windows, millwork, and finishes. Structural work includes new beams and columns to redirect gravity load transfer. A maximum of 108 children are allowed per the Conditional Use Permit. A separate permit is required to establish a Certificate of Occupancy for the adjacent office tenant space located in the West end of this building. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/15/20181/16/20181/16/2018APASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.
INSP-Sprinkler Rough-in/Hydro11/21/201711/22/201711/22/2017APASS
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping complete. Rough to cover inspection for overhead fire sprinkler piping complete, approved for cover.
INSP-Sprinkler Rough-in9/28/20179/28/20179/28/2017PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping/upright heads above hardlids complete, hardlids approved for cover.
Sprinkler Plan Check10/3/2016 10/3/2016 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  10/3/2016 DONE
DetailsTim Frost
Permit Ready to Issue  10/3/2016 DONE
Issue and Print Permit  10/3/2016 DONE
Inspection Record Card- Fire10/3/2016 10/3/2016 DONE
DetailsCandy A. Nichols
Sprinkler Plan Check9/16/2016 9/16/2016 FAIL
DetailsTim Frost
Miscellaneous action  9/16/2016 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Sprinkler Plan Check9/6/2016 9/6/2016 FAIL
DetailsTim Frost
1st review completed  9/6/2016 FAIL
DetailsTim Frost
Miscellaneous action  9/6/2016 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Intake Approval  9/2/2016 PASS
Plan assigned to (Tim)9/2/2016 9/2/2016 DONE
DetailsTim Frost
Application received  8/30/2016 DONE
Application submitted via PDS Online on Aug 30 2016 1:20PM